TO-262-3 Long Leads, I²Pak, TO-262AA
| Fr. Teil# | Beschreibung | Hersteller | Auf Lager | Operation |
| BTA312G-600CTQ | BTA312G-600CT/I2PAK/STANDARD M | 8947 |
|
|
| RGT30NS65DGC9 | IGBT | 9653 |
|
|
| IRG4BC40W-LPBF | IGBT 600V 40A TO262 | 8253 |
|
|
| HGT1S14N36G3VLT | IGBT 390V 18A 100W TO262AA | 4582 |
|
|
| HGT1S2N120CN | IGBT 1200V 13A 104W I2PAK | 7121 |
|
|
| HGT1S20N36G3VL | IGBT 395V 37.7A 150W TO262AA | 5051 |
|
|
| IRGSL4062DPBF | IGBT 600V 48A 250W TO262 | 5313 |
|
|
| AUIRGSL4062D1 | IGBT 600V 59A 246W TO-262 | 6181 |
|
|
| HGT1S15N120C3 | 35A, 1200V, N-CHANNEL IGBT | 5662 |
|
|
| AUIRGSL30B60K | IGBT 600V 78A 370W TO262 | 2633 |
|
|
| RGT8NS65DGC9 | IGBT | 975 |
|
|
| RGT16NS65DGC9 | IGBT | 673 |
|
|
| RGT50NS65DGC9 | IGBT | 965 |
|
|
| HGT1S3N60C3D | 6A, 600V, N-CHANNEL IGBT | 365 |
|
|
| HGT1S7N60B3 | 14A, 600V, N-CHANNEL IGBT | 400 |
|
|
| HGT1S7N60B3D | 14A, 600V, N-CHANNEL IGBT | 400 |
|
|
| IRGSL30B60KPBF | IGBT 600V 78A 370W TO262 | 4254 |
|
|
| HGT1S12N60C3R | 24A, 600V N-CHANNEL IGBT | 3949 |
|
|
| HGT1S12N60C3D | 24A, 600V, N-CHANNEL IGBT | 4365 |
|
|
| HGT1S12N60B3 | 27A, 600V, N-CHANNEL IGBT | 917 |
|
|
| HGT1S12N60B3D | 27A, 600V, N-CHANNEL IGBT | 400 |
|
|
| IRGSL15B60KDPBF | IGBT 600V 31A 208W TO262 | 3734 |
|
|
| IRGSL15B60KDPBF-INF | IGBT W/ULTRAFAST SOFT RECOVERY D | 250 |
|
|
| HGT1S12N60C3 | 27A, 600V, UFS N-CHANNEL IGBT | 899 |
|
|
| HGT1S20N60C3R | 40A, 600V, RUGGED N-CHANNEL IGBT | 580 |
|
|
| FGI3236-F085 | IGBT 360V 44A 187W I2PAK | 971 |
|
|
| IRGSL4640DPBF | DIODE 600V 24A COPAK-262 | 800 |
|
|
| FGI40N60SFTU | IGBT 600V 80A 290W I2PAK | 900 |
|
|
| STGB35N35LZ-1 | IGBT 345V 40A 176W I2PAK | 951 |
|
|
| IRGSL4B60KD1PBF | IGBT NPT 600V 11A TO262 | 4553 |
|
|
| IRGSL6B60KDPBF | IGBT NPT 600V 13A TO262 | 6289 |
|
|
| IRGSL10B60KDPBF | IGBT NPT 600V 22A TO262 | 8855 |
|
|
| RGT40NS65DGC9 | IGBT | 2888 |
|
|
| FGI3040G2_F085 | IGBT, 41A, 390V, N-CHANNEL | 5616 |
|
|
| ISL9V5036S3 | IGBT 390V 46A 250W TO262AA | 7213 |
|
|
| HGT1S7N60C3D | IGBT, 14A, 600V, N-CHANNEL | 4250 |
|
|
| AUIRGSL30B60K-IR | IGBT, 78A I(C), 600V V(BR)CES, N | 5762 |
|
|
| HGT1S14N36G3VLT_NL | IGBT, 18A, N-CHANNEL | 5411 |
|
|
| FGI3040G2-F085C | ECOSPARK2 IGN-IGBT TO262 | 3264 |
|
|
| TSI10L200CW | DIODE ARRAY SCHOTTKY 200V I2PAK | 4235 |
|
|
| TSI20H150CW | DIODE ARRAY SCHOTTKY 150V I2PAK | 6014 |
|
|
| VI40120C-E3/4W | DIODE ARRAY SCHOTTKY 120V TO262 | 708 |
|
|
| VI40100C-E3/4W | DIODE ARRAY SCHOTTKY 100V TO262 | 9001 |
|
|
| NTSB30120CT-1G | DIODE ARRAY SCHOTTKY 120V I2PAK | 400 |
|
|
| MBRB3045CT-1G | DIODE ARRAY SCHOTTKY 45V I2PAK | 576 |
|
|
| STPS3045CR | DIODE ARRAY SCHOTTKY 45V I2PAK | 997 |
|
|
| STPS30H60CR | DIODE ARRAY SCHOTTKY 60V I2PAK | 998 |
|
|
| MBRB41H100CT-1G | DIODE ARRAY SCHOTTKY 100V I2PAK | 271 |
|
|
| TSI20H200CW | DIODE ARRAY SCHOTTKY 200V I2PAK | 761 |
|
|
| TSI10H120CW | DIODE ARRAY SCHOTTKY 120V I2PAK | 950 |
|